Bedrock for VPs of Operations

Summary: Operations leaders use Bedrock to reduce margin erosion from missed changes across their portfolio by standardizing how teams identify and capture scope changes.

The Problem at Scale

Individual projects miss drawing changes. Across a portfolio, these misses compound:

  • Average project experiences 10-15 drawing revisions
  • Each revision may contain dozens of scope changes
  • Missed changes become unrecovered costs
  • Margin erosion accumulates project after project

According to Autodesk/FMI research, 52% of construction rework stems from poor project data and miscommunication. Drawing changes that go undetected contribute directly to this.

The Margin Erosion Problem

SourceImpact
Missed scope additionsWork performed without compensation
Undocumented changesWeak position in disputes
Late change discoveryEmergency mobilization costs
Rework from missed coordinationDirect margin loss
Change order backlogsDelayed cash collection

A 2% margin erosion from missed changes on a $100M portfolio is $2M in lost profit.

How Bedrock Addresses This

Standardized Process

Every project team follows the same comparison workflow:

  1. New drawings arrive
  2. Upload to Bedrock within 24 hours
  3. Review and document changes
  4. Distribute to affected parties
  5. Pursue change orders where applicable

No more variation in how teams catch changes.

Visibility Across Portfolio

Operations dashboards show:

  • Comparison activity by project
  • Changes detected and documented
  • Potential cost impact identified
  • Change order capture rate

Know which projects are following process and which need attention.

Reduced Dependency on Individual Performance

Manual comparison quality varies by:

  • Individual attention to detail
  • Experience level
  • Workload and fatigue
  • Available time

Automated comparison provides consistent baseline across all projects.

Business Case

Before Bedrock

MetricTypical Reality
Comparison consistencyVaries by PE skill
Changes missed5-15% estimated
Change capture timeDays to weeks
Documentation qualityInconsistent
Margin impactUnknown until closeout

With Bedrock

MetricImprovement
Comparison consistencyStandardized across portfolio
Changes missedReduced (automated detection)
Change capture timeHours, not days
Documentation qualityConsistent, timestamped
Margin impactVisible as changes occur

Implementation Considerations

Rollout Approach

PhaseFocus
Pilot2-3 projects with engaged PMs
ValidationMeasure time savings and change capture
ExpansionRoll to additional projects
StandardInclude in project startup procedures

Success Metrics

Track these to measure impact:

  • Time spent on drawing comparison (should decrease)
  • Changes identified vs historical baseline
  • Change order capture rate
  • Disputes involving drawing changes (should decrease)
  • Margin at closeout vs bid

Organizational Requirements

  • PE engagement: Teams must actually use the tool
  • Process integration: Comparison must be part of standard workflow
  • Management visibility: Dashboard review in portfolio meetings
  • Accountability: Comparison SLAs for new revisions

What Bedrock Does NOT Do

  • Does not guarantee change order approval: You still negotiate with owners
  • Does not replace project management: It’s a tool, not a system
  • Does not solve all margin issues: Many factors affect profitability
  • Does not work without adoption: Teams must use it consistently

Bedrock reduces one source of margin erosion. It’s not a complete solution.

Portfolio-Level ROI

Simple Calculation

FactorValue
Annual revenue$100M
Estimated margin erosion from missed changes1-2%
Potential recovery$1-2M annually
Bedrock costUsage-based (fraction of recovery)

Even partial improvement in change capture delivers meaningful ROI.

Risk Reduction Value

Beyond direct savings:

  • Fewer disputes at closeout
  • Better owner relationships (documented changes)
  • Reduced rework costs
  • More predictable project outcomes

FAQ

How do I get teams to actually use it?

Start with engaged project teams for pilots. Demonstrate time savings and results. Include in project startup checklists. Review in portfolio meetings.

What if we already have a comparison process?

Bedrock can augment existing processes. Some teams use Bedrock to validate manual review. Over time, automation typically replaces manual methods for efficiency.

How do I measure ROI?

Track change orders captured, time spent on comparison, and disputes at closeout. Compare to historical baseline before Bedrock adoption.

What does implementation look like?

Minimal IT involvement. Bedrock is cloud-based. Training takes 30-60 minutes per user. Most teams are productive within the first comparison.

Key Takeaways

  • Missed drawing changes erode margin across the portfolio
  • 52% of rework stems from poor project data (Autodesk/FMI)
  • Standardized comparison process ensures consistent change capture
  • Visibility across portfolio shows which projects follow process
  • ROI comes from better change capture and reduced disputes
  • Implementation is lightweight; value comes from consistent adoption